02866.825.791
Design Consulting, Design Verification; FF Permit; Construction Permit. Supervising.
Lot Cr5-1 - Area A - New Urban Area South of Ho Chi Minh city
Preparation of Feasibility Study Report, Basic Design, Total Investment Estimate, Construction Drawing Design, and Cost Estimate
Cai Nuoc Town, Cai Nuoc District, Ca Mau Province
Technical Park Design and Construction Permit; Environmental Permit.
Lot C17-2 & C12B-2 - Area A - New Urban Area South of Ho Chi Minh city
Consulting, Building permit, Fire Fighting permit, Environment and as build permit; Supervising
An Nhon Industrial Park, Binh Dinh Province
Project Manager & Supervising
District 3, Ho Chi Minh City
Master Plan 1/500, Design Verification; FS appraisal; Environment permit Building Permit. As Build permit; Pink Book (subcontractor)
Chau Duc Industrial Park, Chau Duc District, Ba Ria - Vung Tau Province, Vietnam
Design Verification, Total Investment Estimate and Cost Estimate
Hamlet 5, Ward 1, Ca Mau City, Ca Mau Province
Design Verification; FS permit; Building permit. (subcontractor)
Lot I-14.5, D14 Street, Hi-Tech Park, Tang Nhon Phu B Ward, Thu Duc City, Ho Chi Minh City
Master Plan 1/500 and Infrastructure Design (subcontractor)
Dong Ha District, Binh Thuan Province
Phung Hiep District, Hau Giang Province