Our Projects

Footwear and Sports Equipment Manufacturing and Processing Plant

1/500 Detailed Master Plan Preparation and Approval; Design Consultancy; Feasibility Study Report Preparation; Construction Permit Application.

VH02 – Tri Yen Residential Quarter, Can Giuoc Commune, Tay Ninh Province, Vietnam

Footwear and Sports Equipment Manufacturing and Processing Plant

1/500 Detailed Master Plan Preparation and Approval; Design Consultancy; Feasibility Study Report Preparation; Construction Permit Application.

VH01 – Thuan Dao Industrial Park, Ben Luc Commune, Long An Province, Vietnam

PepsiCo Food Manufacturing Plant in Ha Nam Province

Acceptance of Completed Works for Use.

Lot CN 02, Dong Van I Expanded Industrial Park, Dong Van Ward, Ninh Binh Province, Vietnam.

JAPFA COMFEED VIETNAM FACTORY – BINH DINH BRANCH

Acceptance of Completed Works for Use.

Nhon Hoa Industrial Park, An Nhon Nam Ward, Gia Lai Province, Vietnam

ELECTRONIC TRIPOD VIETNAM (CHAU DUC) FACTORY

Preparation and Approval of the 1/500 Detailed Master Plan; Design Consultancy; Preparation and Approval of Fire Prevention and Firefighting (PCCC) Documents; Feasibility Study Report Appraisal; and Construction Commencement Notice.

Chau Duc Industrial Park, Nghia Thanh Commune, Ho Chi Minh City, Vietnam

SABECO OFFICE AND WAREHOUSE FACILITY

Design Consultancy and Application for Technical Infrastructure Connection Approval.

Ho Van Cong St., Chanh Hiep Ward, Ho Chi Minh City, Vietnam

COMPASS II COMPANY LIMITED PROJECT

1/500 Master Plan (General Site Planning); Design Appraisal; Fire Prevention and Fighting (FPF) Approval; Environmental Permit; Construction Permit.

No. 35–37 Doc Lap Boulevard, Vietnam–Singapore Industrial Park, Binh Hoa Ward, Ho Chi Minh City, Vietnam

SPECTRE THAI BINH GARMENT TECHNOLOGY PROJECT

Preparation of 1/500 Master Planning Documents; Submission for Approval of 1/500 Master Planning Documents; Utility Connection Agreements for Design Works; Pre-construction Works: Test Pile Loading and Underground Infrastructure; Appraisal of Basic Design; Appraisal of Feasibility Study Report; Fire Prevention and Fighting (FPF) Approval; Appraisal of Technical Design; Construction Permit Application.

Lot CN4, Song Tra Industrial Park, Thai Binh Ward, Hung Yen Province, Vietnam

BMWINDOWS JOINT STOCK COMPANY FACTORY

Topographic Survey; Preparation and Submission for Approval of 1/500 Master Planning Documents; Utility Connection Agreements for Design Works; Preparation and Submission for Approval of Environmental Documentation; Appraisal of Feasibility Study Report; Fire Prevention and Fighting (FPF) Approval; Appraisal of Technical Design; Application for Construction Permit.

Lot 41, D02 Road, Chau Duc Industrial Park, Nghia Thanh Commune, Ho Chi Minh City, Vietnam

Contact Us

Tri Viet is your top choice for an effective and industry-leading solution at a reasonable price

Get in Touch

TRI VIET ENGINEERING J.S.C

Location:

Head Office – HCM City:

No. 246, 1A Street, An Lac Ward, Ho Chi Minh City

Representative Office – Thu Duc:

No. 14 Street No. 13, Van Phuc Residential Area, Hiep Binh Ward, Ho Chi Minh City

Representative Office – Ha Noi:

No. 8, Alley 12, Le Trong Tan Street, Ha Dong Ward, Hanoi City

Telephone:
02866.825.791

© 2026 Tri Viet Engineering Consulting J.S.C. All rights reserved.