Our Projects

SCHUETZ VIETNAM PLASTIC DRUM AND COMPONENT MANUFACTURING PLANT
Preparation and approval of the 1/500 Master Plan, appraisal of the Feasibility Study Report, application for Environmental Permit, and Construction Permit.
Lot K3, D2 Road, Phu My 3 Specialized Industrial Park, Phuoc Hoa Ward, Phu My Town, Ba Ria – Vung Tau Province.

40,000 TONS PER YEAR SINTERED PLATE CORUNDUM PROJECT
Feasibility Study Appraisal, Fire Protection Approval, Planning Consultation, Environmental Permit Application.
Lot B5-1, N6 Road, Phu My II Industrial Park, Tan Phuoc Ward, Ho Chi Minh City.

HAI THANH L.A RESIDENTIAL AREA
Design Consulting
Long Hau Town, Can Giuoc District, Long An Province

CANIAO DONG NAI INTELLIGENT OPERATION CENTER
Master Plan 1/500, Design Verification; FS appraisal; Environment permit Building Permit. As Build permit; Pink Book (subcontractor)
Lot 8, Road 5, Giang Dien Industrial Park, Giang Dien Commune, Trang Bom District, Dong Nai Province

ENI-FLORENCE BATTERY JOINT STOCK COMPANY
Master Plan 1/500; Design Consulting; FS appraisal; Building Permit. Supervising; As Build permit
Lot C12 Khanh Phu Industrial Park, Khanh Phu Town, Yen Khanh District, Bac Ninh Province

BAOSTEEL VIET NAM FACTORY – LONG AN BRANCH
Master Plan 1/500, Design Consulting; FS appraisal; Building Permit. As Build; Pink Book..
Phu An Thanh Industrial Park, An Thanh Commune, Ben Luc Dictrist, Long An Province

COCA-COLA VIET NAM FACTORY – LONG AN BRANCH
Master Plan 1/500, Design Verification; FS appraisal; Building Permit. As Build permit.
Phu An Thanh Industrial Park, An Thanh Commune, Ben Luc Dictrist, Long An Province

HUU NGHI FOOD FACTORY
Design Consulting; FF Permit; Building Permit.
Lot CN15-2, Yen Phong Industrial Park, Yen Phong District, Bac Ninh Province, Vietnam

KINH CUNG NEW URBAN AREA
Preparation of Feasibility Study Report, Basic Design, Total Investment Estimate, Construction Drawing Design, and Cost Estimate
Phung Hiep District, Hau Giang Province