02866.825.791
Appraisal of Construction Drawing Design
Bao Vinh Ward, Long Khanh City, Dong Nai Province
Supervising
District 7, Ho Chi Minh City
Master Plan 1/500, Design Verification; FS appraisal; FF Permit; Building Permit. (subcontractor)
Phu My I Industrial Park, Phu My Town, Ba Ria - Vung Tau Province
Preparation and approval of the 1/500 Master Plan, appraisal of the Feasibility Study Report, application for Environmental Permit, and Construction Permit.
Lot K3, D2 Road, Phu My 3 Specialized Industrial Park, Phuoc Hoa Ward, Phu My Town, Ba Ria – Vung Tau Province.
Design Consulting; (subcontractor)
Binh Chuan Ward, Thuan An, Binh Duong Province
Design Verification. (subcontractor)
Dong Nai Province
Master Plan 1/500, Design Verification; FS appraisal; Environment permit; FF Permit; Building Permit.
Long Hau 3 Industrial Park, Long An Province
Design Consulting; FS appraisal; Environment permit; FF Permit; Building Permit; Supervising; As Build permit
Lot A17, A18- Lot DV3 Minh Hung - Sikico Industrial Park, Dong No Commune, Hon Quan District, Binh Phuoc Province
Design Consulting
Dong Xoai City, Binh Phuoc Province
Supervising; As Build permit; Pink Book.
Road 1A, Phu My I Industrial Park, Phu My Ward, Phu My City, Ba Ria - Vung Tau Province